EN 10305-3 E195 ERW Welded Cold Sized Carbon Steel Tube For Precision Applications
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 5tons | Price : | 1200-1400USD/ton |
---|---|---|---|
Packaging Details : | In bundles | Delivery Time : | 5-8 week days |
Payment Terms : | L/C, T/T | Supply Ability : | 5000tons per year |
Place of Origin: | China | Brand Name: | Torich |
---|---|---|---|
Model Number: | EN10305-1 |
Detail Information |
|||
Certification: | ISO 9001 ISO14001 TS16949 | Material: | E355 E235 St52 16Mn 1045 |
---|---|---|---|
Standard: | EN10305-1 | OD: | 6 - 350 Mm |
WT: | 1 - 35 Mm | Application: | Mechanical Purpose |
Length: | Max 12000mm | ||
High Light: | precision seamless pipe,precision pipes and tubes |
Product Description
Precision Automotive Steel Tubes En10305-1 Ready to Honed steel pipes
Size range: O.D.:6-350mm W.T.:1-35mm L:max12000mm
Standard: EN10305-1 ASTM A519 GB/T3639 DIN2391 JIS G3445
Material:E235/ SAE1020/ SAE 1045 /10 # 20# 45#/ /DIN ST52/STKM 11A /STKM12B
Straightness:1/1000m
Tolerance: OD≤0.08mm WT:≤+/-0.15
Improve the precision with method: Cold drawn/DOM
Product Feature of precision cylinder 1020 honed steel pipe and tube:
1.High precision (can cut the costs of machining) .
2.Excellent surface finish
3.Good mechanical performance (Aneal ,Bright Anealing,QT heatment on steel tubes to reach customers' Mechanical requsts. )
Chemical composition %(Max)
|
C
|
Si
|
Mn
|
P
|
S
|
E235
|
0.22
|
0.55
|
1.60
|
0.025
|
0.025
|
SAE1020
|
0.18-0.23
|
|
0.30-0.60
|
0.04
|
0.05
|
SAE 1045
|
0.43-0.50
|
|
0.60-0.90
|
0.04
|
0.05
|
10 #
|
0.07-0.13
|
0.17-0.37
|
0.35-0.65
|
0.035
|
0.035
|
20#
|
0.17-0.23
|
0.17-0.37
|
0.35-0.65
|
0.035
|
0.035
|
45#
|
0.42-0.50
|
0.17-0.37
|
0.50-0.80
|
0.035
|
0.035
|
St52
|
0.22
|
0.55
|
1.6
|
0.25
|
0.025
|
STKM 11A
|
0.12
|
0.35
|
0.6
|
0.04
|
0.04
|
STKM12B
|
0.20
|
0.35
|
0.6
|
0.04
|
0.04
|
1.+C /BK | No heat treatment after final cold drawing process. |
2.+LC/BKW | After the final heat treatment there's a suitable drawing pass. |
3.+SA/BKS | After the final cold drawing process there's a stress relief heat treatment in controlled atmosphere. |
4.+A/GBK | After the cold drawing process the tubes are annealed in a controlled atmosphere. |
5.+N/NBK | After the final cold drawing operation the tubes are normalized in a controlled atmosphere. |
Items & Condition of precision hot rolled steel tube
Delivery: 30-45days
Payment : T/T. LC.Alibaba Tade Assurance Order
Packaging: In Hexagonal bundles ,Wooden boxes packaging.
Quantity tolerance: +/-10%
Marks on pipes(tubes): Standard,Steel Grade, Size, Heat No.( or at the buyer's option).
Mill Test Certificate:EN10204 3.1
Enter Your Message