ASTM A789 Super Duplex 2507 Pipe Cold Drawn Stainless Steel Tube For Petrochemical
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 2 tons | Price : | $800-1500 |
---|---|---|---|
Packaging Details : | Packed in hexagonal in boxes | Delivery Time : | 30-45 days |
Payment Terms : | L/C, L/C, D/A, D/A, T/T, T/T, Western Union, MoneyGram | Supply Ability : | 50 tons per month |
Place of Origin: | China | Brand Name: | Torich |
---|---|---|---|
Certification: | ISO,CE | Model Number: | ASTM A269 |
Detail Information |
|||
Name: | TP304 TP316 Seamless ASTM A269 Precision Stainless Steel Tubing | Standard: | ASTM A269 |
---|---|---|---|
WT: | 5-420mm | OD: | 0.5-50mm |
Material: | TP304,TP316,etc | Usage: | Heat Exchanger,boiler,heater |
High Light: | stainless steel round tube,stainless tube steel |
Product Description
Torich TP304 TP316 Seamless ASTM A269 Precision Stainless Steel Tubing
Introduction:
Name | TP304 TP316 Seamless ASTM A269 Precision Stainless Steel Tubing |
Standard | ASTM A269 |
Production method | Seamless,welded |
OD | 5-420mm |
WT | 0.5-50mm |
Usage | Heat exchanger,boiler,heater |
Material | TP304,304l316,316L |
Section shape | Round |
Payment | T/T,L/C,Money Gram,Western Union |
Production method: The tubes shall be mad eby the seamless or welded process.
At the manufacuturer's opinion, tubing may be furnished eithor hot finished or cold finished.
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
product show:
Enter Your Message