GB/T 8162 42CrMo Alloy Steel Tube Cold Drawn Carbon Steel Alloy Steel Pipr For Mechanical
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 1 tons | Packaging Details : | Packing in cartons |
---|---|---|---|
Delivery Time : | 25-30 days | Payment Terms : | L/C, D/A, D/P, T/T, Western Union, Western Union, MoneyGram |
Supply Ability : | 50 tons per month |
Place of Origin: | China | Brand Name: | Torich |
---|---|---|---|
Certification: | CE,ISO | Model Number: | GB/T3624 |
Detail Information |
|||
Name: | Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes | Standard: | GB/T 3625, GB/T 3624,ASTM B338 |
---|---|---|---|
Type: | Alloy | Grade: | TA1、TA1ELI、TA2、TA2ELI、TA9、TA10 |
Usage: | Heat Exchanger, Condenser | Section Shape: | Round |
High Light: | alloy steel tube,alloy steel seamless tube |
Product Description
Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes
Brief introduction:
Name | GB/T 3624 Titanium Alloy Heat Exchanger Tubes |
Standard | GB/T 3625, GB/T 3624,ASTM B338 ,ASTM B861 ,ASTM 4942 ,JIS H4630,JIS H4631,JIS H4635,DIN 17861,DIN 17866,GOST 24890, GOST 21945 ,GOST 22897 |
Grade | TA1,TA1ELI,TA2,TA2ELI,TA9,TA10 |
Type | Alloy |
Usage | Heat exchanger, condenser |
Size range | Φ(3-159)×(0.2-6.0) ×L Condition: Hot rolled |
Φ(25-210)×(3.0-6.0) ×L Condition: Cold Rolled |
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
Product show:
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment ?
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
Enter Your Message