EN 10305-4 E215 Seamless Cold Drawn Precision Steel Tubes For Pneumatic Power Systems
Contact Person : Richard SHEN
Phone Number : +86-13736164628
WhatsApp : +8613736164628
Minimum Order Quantity : | 1 Ton | Price : | Negotiated |
---|---|---|---|
Packaging Details : | in hexagon packing with woven bags covered | Delivery Time : | 25-35 days |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability : | 25000tons/year |
Place of Origin: | China | Brand Name: | TORICH |
---|---|---|---|
Certification: | ISO,CE | Model Number: | DIN2391 |
Detail Information |
|||
Product Name: | Cold Drawn 17mm High Precision Steel Tube ST52 DIN2391 Tube Seamless Pipe | WT: | 0.5-50mm |
---|---|---|---|
OD: | 4-420mm | Length: | 5.8m-11.8m |
Standard: | Din2391 EN10305-1 | Usage: | Hydraulic Cylinder, Honed Steel Tube |
Surface Finish: | Oiled | Keyword: | High Pression Cold Drawn Steel Pipe |
High Light: | Stress Relieved Cylinder Cold Rolled Tube,Honed Cold Rolled Tube,E355 Cold Rolled Tube |
Product Description
Cold Drawn 17mm High Precision Steel Tube ST52 DIN2391 Tube Seamless Pipe
TORICH is a rich-experienced manufacturer of steel tube especially for precision DIN2391, EN103051, etc steel tube.
1.Brief introduction of cold drawn high precision steel tubes of DIN2391:
OD:16-325mm WT:1-22mm
Material:ST35, ST45,ST52, ST30 Si, ST30Al
Our testing:
dimensional check,
surface inspection,
tensile test
flattening test
drift expanding test
Length tolerance:
up to 500mm: +2mm/-0mm
above 500mm up to 2000mm: +3mm/-0mm
above 2000mm up to 5000mm: +5mm/-0mm
length above 5000 up to 7000mm: +10mm/0mm
Tube ends:
Cold darwn high precision steel tube shall be cut nominally square to the tube axis and shall be free from excessive burrs.
Quantity ordered in meters:
up to 500: +20% deviation
above 500 up to 2000: +15% deviation
above 2000: +10% deviation
2.Final supply conditions:
BK (+C) Cold finished/hard (cold finished as drawn) | No heat treatment after the last cold forming process. |
BKW (+LC) Cold finished/soft (lightly cold worked) |
After the last heat treatment there is a light finishing pass (cold drawing).
|
BKS (+SR) Cold finished/stress relieve annealed. | After the final cold forming process the tubes are stress relieve annealed. |
GBK (+A) Annealed | After the final cold forming process the tubes are annealed in a controlled atmosphere |
NBK (+N) Normalized. (Mainly focus on) | After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere |
3.Mechancial properties:
Steel grade
|
BK |
BKS |
GBK |
NBK |
||||||
---|---|---|---|---|---|---|---|---|---|---|
Tensile Strength Rm N/mm min |
Elongation % min |
Tensile Strength Rm N/mm min |
Tensile Strength Rm N/mm min |
Elongation % min |
Tensile Strength Rm N/mm min |
Elongation % min |
Tensile strength Rm N/mm min
|
Yield strength ReH N/mm min |
Elongation % min |
|
St35 | 480 | 6 | 420 | 315 | 14 | 315 | 25 | 340-470 | 235 | 25 |
St45 | 580 | 5 | 520 | 375 | 12 | 390 | 21 | 440-570 | 255 | 21 |
St52 | 640 | 4 | 580 | 420 | 10 | 490 | 22 | 490-630 | 355 | 22 |
QUALITY CONTROL
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
4.Cold drawn high precision steel tube product show:
5.Packing method of precision cold drawn steel tube:
FAQ
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us
Enter Your Message